Field Development Study - Ukraine
o New platform, pipelines, and compression stations,
located in Black Sea.
o 150 MMSCFD natural gas.
o Study included cost analysis and viability of project.

Field Development Study - Thailand
o Study included fixed platforms vs FPSO, cost analysis,
preliminary design and selection of best option.
o 50,000 BPD crude oil, 200 MMSCFD of natural gas
production rates.

Design/Project Management - Bella Field, Nigeria
o Single platform with 45,000 BPD crude oil, 100 MMSCFD
of natural gas (flaring).
o Pipeline system connected to Chevron's pipeline system.

Feasibility Study - LNG Plant, Nigeria
o 750 MMSCFD of natural gas to be converted to LNG.
o Preliminary design and cost analysis of plants, storage, loading, and liquefaction and degasification related infrastructure.

Offshore Production Platform, Pipelines - Gulf of
Mexico (Galveston), U.S.A.
o 128ft x 72ft 4-pile offshore platform in 365 ft. of water.
o 24" and 18" gas pipelines with pig launchers and receivers.
o Production rates of 400,000 MMSCFD and 50,000 BOPD.

Petroport Concept Design - U.S.A.
o Facility located 26 miles offshore (100ft depth) and
connected by a 48" pipeline to onshore facilities (26 miles
long).
o Low cost of loading of petroleum and related products.
o Two single point mooring buoys (SPM's) accommodate the
largest crede transport tankers (550,000 BWT).
o Crude oil from tankers can be offloaded and then pumped
directly on shore at rates up to 1.8 mmbls/day.
o Central pumping platform is a multi-pile structure with
9,000 BPH oil pumps, two 20 Mega Watt generators, two 40
ton pedestal cranes with 100 ft booms, two 50 ton bridge
cranes, two 15' OD X 75' long oil surge tanks.
o Preliminary design included salt cavern storage.

Waterflood Project - Offshore Nigeria
o 6,000 BPD water injection facility.

CO2 Flood Project - Liberty, Mississippi, U.S.A.
o Engineering and current construction supervision of a plant
upgrade to increase processing capacity an onshore oil
processing facility using CO2 flooding for secondary
recovery.
o CO2 compression was added to increase the CO2 injection
capacity. CO2 source and injection well piping networks
were also modified for increased capacity.
o Approximately 50 producing wells and 25 injection wells
are active. Current CO2 production is approximately 90
mmscfd. The expanded production capacity is 150 mmscfd.
o Current oil production is approximately 2500 bopd with a
future expected rate of 4000 bopd.

Natural Gas facilities and pipeline feasibility study -
Trinidad
o Feasibility study per natural gas pipeline and processing
facilities
o Inland turbine driven compressor station

Field Development Study - Egypt

Platform Start-up and Operations Procedures - Brae
Field, North Sea

Offshore Production Platform - Gulf of Mexico
(South Timbalier), U.S.A.
o Design of an offshore production platform in the Gulf of
Mexico for the production of 110 million standard cubic feet
per day of gas and 8,500 BPD oil.
o 40ft x 80ft 4-pile production deck in 153 feet of water.

Solar Turbine Facility - Venezuela

Vibration Analysis for Control Panels - Dutch North Sea

Sour Gas Plant Processing - Jackson, Mississippi, U.S.A.

Field Development Study - Egypt

<<back next >>

Corporate
Browse through the corporate section for more information on our organization.

Contact
Please contact us for more information on our company or how we can help you

 

.

 

menuCorporate

Copyright © 2000-2003 Atlas Engineering, Inc. All rights reserved. Please Read our Disclaimer. Send comments to webmaster. Site designed by ATyrimos